RONDO ONZ office building in Warsaw
Construction site: Office building Rondo ONZ in Warsaw
Investor: Hochtief Development References
Implementation: I Q 2004 - IV Q 2005
Overall area: 106,000 sqm
Cubature: 308,000 cbm
Scope of works:
The high current undertakings of Elektromontaż Poznań includes the following: a 2500 KVA generator, 13 1250 and 1600 KVA cast resin transformers, 28 line medium voltage switchgear, 18 low voltage main switchgears, 364 low voltage switchgear panels, more than 1000 m of 800-3600 A busbars, more than 200 km of cables and wiring, approx. 23,000 lamp fittings, 10 km cable conduits (including E-90 certified fire resistant conduits), design documentation and as-done documentation
