Achievement of the Year

Construction site: building the wet flue gas desulfurization system of Siekierki Heat and Power Station in Warsaw

General contractor: Rafako Boiler Factory

Implementation: 4Q 2008 – 4Q 2011
The general scope of works performed by our company:
The basic and the engineering design of the power evacuation and the wet flue gas desulfurization system; electrical systems - power evacuation – performed in two stages; electrical systems for the wet flue gas desulfurization system – performed in two stages.