Volkswagen Distribution Centre in Swarzędz
Construction site: Volkswagen Distribution Centre, Swarzędz
Investor: ILS Ltd., Swarzędz Jasin
Area overall: 112.00 sqm References Himpel
Cubature: 1,568 cbm References CDS
Implementation: II Q 2002
Scope of the works:
high current wiring including the medium voltage 15 kV mains, the cabling and power supply busbars; as well as the 15 kV main switchgear, 15/0.4 kV transformers, outdoor lighting and a process power supply with a 4% short-circuit voltage transformer.