HV/MV power station in Piastowice
Construction site: HV/MV power station in Piastowice - construction
Employer: ENEA Operator Sp. z o.o.
Implementation: I Q 2011 - I Q 2012
Scope of works:
Design documentation and building constructions: building and initiation of Hv and Mv transformer station with concomitant infrastructure; power generator of Hv and Mv station with two 110 kV overhead single-track lines; building of access and internal roads together with car parks; building of junctions to existing water pipe network; launching telemechanics and telecontrolling and reproducing the read of the connectors, automation and measurements; introducing data transmission from electric energy measurement arrangements.