LM Glasfiber propeller blade factory in Goleniów
Construction: LM Glasfiber propeller blade factory in Goleniów
Investor: LM Glasfiber company
Implementation: III Q 2008 – I Q 2009
Area: 11 500 m2
Within the scope of the works, our company makes the high-current systems, including delivery and assembly of: the equipment of the transformer station (the 6-field DRAWA medium-voltage switchgear and the XEnergy low-voltage main switchgear), and delivery and assembly of sub-switchgears
and makes:
medium-voltage and low-voltage outdoor networks; area lighting; Indoor Feeder; lightning protection system; grounding system; socket installations and 3-phase power supply systems; indoor lighting installation.
as well as low-current systems, including:
structured cabling; phone cabling; fire alarm system; intrusion and access control system; gas detection.
