Main supply terminals for Wind Farm in Tychowo

Construction site: Main supply terminal 30/110 kV as a part of the wind farm in Tychowo

Investor: Megawatt Baltica

Elektromontaz Poznań S.A. is a General Contractor                             References

Implementation: II Q 2008 – IV Q 2008.

Scope of works:
30 kV cable lines, 20 windmills of the „Tychowo” wind power plant are connected via: 17.85 km long 30 kV cable line (including via optical fibre cable duct system) to Kończewo (GPZ) substation

2 km of 110 kV overhead line, comprehensive construction of a GPZ 30/110 kV substation, substation buildings, internal roads, foundations under devices, SCADA remote control engineering.

A detailed scope of works performed by our company encompasses provision and commissioning of:
- a 63 kVA 3-phase overhead oil-immersed transformer for the company’s own needs
- three-pole overhead power circuit breaker 123 kV/31.5kA/3150A
- HV 123kV Combined current and voltage transformer
- 123kV current transformer
- Nine SN-30kV switch bays

- LV switchgear (for the company’s own needs, secondary circuits, control and adjustments circuits)