Flue gas desulfurization installation – Ostroleka B
Construction site: Flue gas desulfurization installation in power station Ostrołęka B
Investor: Powerhouse Group – Ostrołęka S.A.
Employer: Boiler Production Facility RAFAKO References
Implementation: III Q 2006 - IV Q 2007
Scope of works:
Delivery and installation of 20 poles for 6 kV main Odra switchgear in Flue Gas Desulfurization Facility (produced by ZPUE Elektromontaz Poznan), 19 poles for 0.4 kV Warta switchgear (produced by ZPUE Elektromontaz Poznan)
Delivery and installation of 6 kV cable lines, 0.4 cable lines, electrical installations for flue gas desulfurization systems, general electrical installations for buildings.