Flue gas desulfurization installation – Ostroleka B

Construction site: Flue gas desulfurization installation in power station Ostrołęka B

Investor: Powerhouse Group – Ostrołęka S.A.

Employer: Boiler Production Facility RAFAKO                             References

Implementation: III Q 2006 - IV Q 2007

Scope of works:
Delivery and installation of 20 poles for 6 kV main Odra switchgear in Flue Gas Desulfurization Facility (produced by ZPUE Elektromontaz Poznan), 19 poles for 0.4 kV Warta switchgear (produced by ZPUE Elektromontaz Poznan)

 

Delivery and installation of 6 kV cable lines, 0.4 cable lines, electrical installations for flue gas desulfurization systems, general electrical installations for buildings.