LCD TV-sets Assembly Facility – FUNAI in Nowa Sól

Construction site: LCD TV-sets Assembly Facility – FUNAI in Nowa Sól

Investor: Funai Electric Poland

Customer: Zueblin Polska

Overall area: 11 650 m2

Implementation: I Q 2007- II Q 2007

Scope of works:
2 x MV 20 kV supply lines, 20/04 kV transformer station, double-transformer station 2x1250 kVA, 2-section MV switchgear with automatic transfer switching devices, 2-section LV Rinn switchgear (6-pole), cable racks and cable channels, internal supply lines leading mostly in cable channels, counter panel, emergency and evacuation lighting, plug-in sockets and socket sets installation, computer plug-in sockets installation

Technological and power devices installation, including: testing area room supply, ventillating and air-conditioning cabinets supply, gas boiler-room supply, compressors room supply, intermediate sewage pumping station supply, intermediate fire pumping station supply, supply system and internal installations in 2 lodges, supply system and battery-electric trucks charging station, roof grooves heating installation, compensatory connections installation.
Installation of outdoor lighting, including sidewalks and internal roads lighting.
Communications installations, including structural wiring, access control systems with worktime logging, fire automation system, monitoring system.